ED SBP SPL (08312) runs from Erode Jn to Sambalpur. It departs from Erode Jn station (ED) at and arrives at Sambalpur station (SBP) at . ED SBP SPL takes 24 hrs to cover the distance of 1691 km between Erode Jn and Sambalpur. It is a non-superfast train. The average speed of this train is 70.45833333333333 kmph. It has classes Second AC (2A), Third AC (3A) and Sleeper (SL). This train runs on Friday. Final chart for ED SBP SPL is prepared at Erode Jn usually 3-4 hours before train departure time.
ED SBP SPL 08312 coach position
ED SBP SPL runs with an ICF Rake and has a total of 20 coaches. It has 2 second seating unreserved coaches, 10 sleeper coaches, 1 pantry car coach, 4 third ac coaches and 1 second ac coach. The full coach composition is: