Hero
Modify Search
  • Train Details
  • Book Train Tickets
irctc
IRCTC Authorised Partner
Search Trains
    Book Train Tickets
      • Tomorrow
        Day after
      • Search
      • No Station found
        Station not found
        Check for spelling errors and try again.
      Select Departure Date
      irctc
      IRCTC Authorised Partner
      • Book Train
      • Modify Search
      • Share

      Bsb Summer Spl 04518 Train Schedule

      Bhatinda Jn to Varanasi Jn | M, T, W, T, F, S, S | 2A, 3A, SL | Express
      Station Platform/Halt Arrival Departure Day
      (0 Km)
      7
      0 min
      Source
      Boarding Station
      20:50
      1
      (32 Km)
      1
      2 min
      21:22
      21:24
      1
      (65 Km)
      1
      2 min
      21:52
      21:54
      1
      (96 Km)
      1
      2 min
      22:28
      22:30
      1
      (148 Km)
      1
      2 min
      23:16
      23:18
      1
      (173 Km)
      2
      17 min
      23:50
      00:07
      2
      (201 Km)
      3
      5 min
      00:55
      01:00
      2
      (252 Km)
      2
      2 min
      01:50
      01:52
      2
      (282 Km)
      4
      10 min
      02:20
      02:30
      2
      (476 Km)
      -
      10 min
      05:40
      05:50
      2
      (566 Km)
      1
      2 min
      07:15
      07:17
      2
      (801 Km)
      -
      10 min
      11:15
      11:25
      2
      (974 Km)
      -
      5 min
      14:55
      15:00
      2
      (1102 Km)
      -
      0 min
      17:30
      Destination
      2

      Bhatinda Jn to Varanasi BSB SUMMER SPL 04518 timing

      BSB SUMMER SPL (04518) runs from Bhatinda Jn to Varanasi. It departs from Bhatinda Jn station (BTI) at from platform 7 and arrives at Varanasi Jn station (BSB) at . BSB SUMMER SPL takes 24 hrs to cover the distance of 1102 km between Bhatinda Jn and Varanasi. It is a non-superfast train. The average speed of this train is 45.916666666666664 kmph. It has classes Second AC (2A), Third AC (3A) and Sleeper (SL). This train runs on Monday and Friday. Final chart for BSB SUMMER SPL is prepared at Bhatinda Jn usually 3-4 hours before train departure time.

      BSB SUMMER SPL 04518 coach position

      BSB SUMMER SPL runs with an ICF Rake and has a total of 21 coaches. It has 2 second seating unreserved coaches, 16 sleeper coaches and 1 third ac coach. The full coach composition is:

      Engine--SLR--GS--S1--S2--S3--S4--S5--S6--S7--S8--S9--S10--S11--S12--S13--S14--S15--S16--B1--GS--SLR

      About Varanasi

      Varanasi, Benaras or Kashi is the spritual capital of India. It grew as an important industrial centre, famous for its muslin and silk fabrics, perfumes, ivory works, and sculpture. Situated on the banks of Ganga, Varanasi has some 20000 temples including Kashi Vishwanath, Sankat Mochan and Durga Mandir. Pilgrims come to the ghats lining the Ganges to wash away sins in the sacred waters or to cremate their loved ones. Buddha gave his first sermon in Kashi. It is the site of Banaras Hindu University (BHU), which is one of the largest residential universities in Asia with over 20,000 students. Varanasi is served by Lal Bahadur Shastri International Airport (VNS), which is approximately 26 km from the city centre in Babatpur. The Diesel Locomotive Works in Varanasi, India, is a production unit owned by Indian Railways, that manufactures diesel-electric locomotives and its spare parts. Varanasi Junction, commonly known as Varanasi Cantt Railway Station, is the city's largest train station. More than 360,000 passengers and 240 trains pass through each day.