Hero
Modify Search
  • Train Details
  • Book Train Tickets
irctc
IRCTC Authorised Partner
Search Trains
    Book Train Tickets
      • Tomorrow
        Day after
      • Search
      • No Station found
        Station not found
        Check for spelling errors and try again.
      Select Departure Date
      irctc
      IRCTC Authorised Partner
      • Book Train
      • Modify Search
      • Share

      Brc Mau Sf Spl 09195 Train Schedule

      Vadodara Jn to Mau Jn | M, T, W, T, F, S, S | 1A, 2A, 3A, SL | Superfast
      Station Platform/Halt Arrival Departure Day
      (0 Km)
      6
      0 min
      Source
      Boarding Station
      19:00
      1
      (74 Km)
      2
      2 min
      20:08
      20:10
      1
      (149 Km)
      2 min
      20:58
      21:00
      1
      (262 Km)
      10 min
      22:35
      22:45
      1
      (528 Km)
      10 min
      02:00
      02:10
      2
      (636 Km)
      2 min
      03:18
      03:20
      2
      (700 Km)
      5 min
      04:10
      04:15
      2
      (777 Km)
      2 min
      05:10
      05:12
      2
      (859 Km)
      10 min
      06:40
      06:50
      2
      (884 Km)
      5 min
      08:05
      08:10
      2
      (1111 Km)
      5 min
      11:30
      11:35
      2
      (1310 Km)
      5 min
      15:25
      15:30
      2
      (1374 Km)
      2 min
      16:50
      16:52
      2
      (1431 Km)
      5 min
      18:35
      18:40
      2
      (1469 Km)
      2 min
      19:15
      19:17
      2
      (1527 Km)
      0 min
      20:45
      Destination
      2

      Chhayapuri to Mau Jn BRC MAU SF SPL 09195 timing

      BRC MAU SF SPL (09195) runs from Chhayapuri to Mau Jn. It departs from Vadodara Jn station (BRC) at from platform 6 and arrives at Mau Jn station (MAU) at . BRC MAU SF SPL takes 24 hrs to cover the distance of 1527 km between Chhayapuri and Mau Jn. It is a non-superfast train. The average speed of this train is 63.625 kmph. It has classes First AC (1A), Second AC (2A), Third AC (3A) and Sleeper (SL). This train runs on Monday. Final chart for BRC MAU SF SPL is prepared at Chhayapuri usually 3-4 hours before train departure time. Active on IRCTC but not in Our DB, so activated the train.

      BRC MAU SF SPL 09195 coach position

      BRC MAU SF SPL runs with an LHB Rake and has a total of 22 coaches. It has 2 second seating unreserved coaches, 1 first ac coach, 2 second ac coaches, 6 third ac coaches, 1 pantry car coach and 8 sleeper coaches. The full coach composition is:

      Engine--SLR--GS--H1--A1--A2--B1--B2--B3--B4--B5--B6--PC--S1--S2--S3--S4--S5--S6--S7--S8--GS--EOG