Hero
Modify Search
  • Train Details
  • Book Train Tickets
irctc
IRCTC Authorised Partner
Search Trains
    Book Train Tickets
      • Tomorrow
        Day after
      • Search
      • No Station found
        Station not found
        Check for spelling errors and try again.
      Select Departure Date
      irctc
      IRCTC Authorised Partner
      • Book Train
      • Modify Search
      • Share

      Bvc Bdts Spl 09208 Train Schedule

      Bhavnagar Terminus to Santa Cruz | M, T, W, T, F, S, S | 2A, 3A, SL | Express
      Station Platform/Halt Arrival Departure Day
      (0 Km)
      0 min
      Source
      Boarding Station
      14:50
      1
      (3 Km)
      1 min
      14:59
      15:00
      1
      (28 Km)
      1
      2 min
      15:27
      15:29
      1
      (49 Km)
      2
      2 min
      15:46
      15:48
      1
      (92 Km)
      1
      2 min
      16:32
      16:34
      1
      (167 Km)
      1
      1 min
      18:00
      18:01
      1
      (298 Km)
      10 min
      20:55
      21:05
      1
      (343 Km)
      1
      2 min
      22:17
      22:19
      1
      (397 Km)
      4 min
      22:58
      23:02
      1
      (526 Km)
      2
      5 min
      01:12
      01:17
      2
      (619 Km)
      2
      2 min
      02:38
      02:40
      2
      (759 Km)
      7
      2 min
      05:28
      05:30
      2
      (778 Km)
      5
      0 min
      06:00
      Destination
      2

      Bhavnagar to Santa Cruz BVC BDTS SPL 09208 timing

      BVC BDTS SPL (09208) runs from Bhavnagar to Santa Cruz. It departs from Bhavnagar Terminus station (BVC) at and arrives at Santa Cruz station (STC) at . BVC BDTS SPL takes 24 hrs to cover the distance of 780 km between Bhavnagar and Santa Cruz. It is a non-superfast train. The average speed of this train is 32.5 kmph. It has classes Second AC (2A), Third AC (3A) and Sleeper (SL). This train runs on Thursday. Final chart for BVC BDTS SPL is prepared at Bhavnagar usually 3-4 hours before train departure time.

      BVC BDTS SPL 09208 coach position

      BVC BDTS SPL runs with an LHB Rake and has a total of 22 coaches. It has 4 second seating unreserved coaches, 2 second ac coaches, 6 third ac coaches and 8 sleeper coaches. The full coach composition is:

      Engine--EOG--GS--GS--A1--A2--B1--B2--B3--B4--B5--B6--S1--S2--S3--S4--S5--S6--S7--S8--GS--GS--EOG