Hero
Modify Search
  • Train Details
  • Book Train Tickets
irctc
IRCTC Authorised Partner
Search Trains
    Book Train Tickets
      • Tomorrow
        Day after
      • Search
      • No Station found
        Station not found
        Check for spelling errors and try again.
      Select Departure Date
      irctc
      IRCTC Authorised Partner
      • Book Train
      • Modify Search
      • Share

      Chennai Sf Exp 12604 Train Schedule

      Charlapalli to Basin Bridge Jn | M, T, W, T, F, S, S | 1A, 2A, 3A, SL | Superfast
      Station Platform/Halt Arrival Departure Day
      (0 Km)
      0 min
      Source
      Boarding Station
      17:25
      1
      (98 Km)
      1 min
      18:48
      18:49
      1
      (136 Km)
      1 min
      19:14
      19:15
      1
      (174 Km)
      1 min
      19:44
      19:45
      1
      (195 Km)
      1 min
      20:03
      20:04
      1
      (227 Km)
      1
      1 min
      20:29
      20:30
      1
      (269 Km)
      1
      10 min
      22:00
      22:10
      1
      (295 Km)
      2 min
      22:58
      23:00
      1
      (317 Km)
      1 min
      23:19
      23:20
      1
      (337 Km)
      2 min
      23:38
      23:40
      1
      (352 Km)
      2 min
      23:53
      23:55
      1
      (401 Km)
      3
      2 min
      00:38
      00:40
      2
      (429 Km)
      2
      2 min
      00:58
      01:00
      2
      (467 Km)
      2 min
      01:28
      01:30
      2
      (518 Km)
      3
      2 min
      02:13
      02:15
      2
      (556 Km)
      2 min
      03:03
      03:05
      2
      (611 Km)
      2
      2 min
      03:43
      03:45
      2
      (693 Km)
      6
      0 min
      05:40
      Destination
      2

      Charlapalli to Basin Bridge Jn CHENNAI SF EXP 12604 timing

      CHENNAI SF EXP (12604) runs from Charlapalli to Basin Bridge Jn. It departs from Charlapalli station (CHZ) at and arrives at Basin Bridge Jn station (BBQ) at . CHENNAI SF EXP takes 24 hrs to cover the distance of 716 km between Charlapalli and Basin Bridge Jn. It is a superfast train. The average speed of this train is 29.833333333333332 kmph. It has classes First AC (1A), Second AC (2A), Third AC (3A) and Sleeper (SL). This train runs daily. Final chart for CHENNAI SF EXP is prepared at Charlapalli usually 3-4 hours before train departure time.

      CHENNAI SF EXP 12604 coach position

      CHENNAI SF EXP runs with an ICF Rake and has a total of 23 coaches. It has 3 second seating unreserved coaches, 1 first ac cum second ac coach, 2 second ac coaches, 3 third ac coaches and 12 sleeper coaches. The full coach composition is:

      Engine--SLR--GS--HA1--A1--A2--B1--B2--B3--S1--S2--S3--S4--S5--S6--S7--S8--S9--S10--S11--SE1--GS--GS--SLR