Gandhinagar Capital to Vaishno Devi Katra GNC JAT EXP 19223 train schedule cloud_download
Station
Arrival
Departure
Halt
Day
Distance
Platform
1
Gandhinagar Capital
( GNC )
1
1 km
2
Kalol Jn
( KLL )
1
21 km
3
Mahesana Jn
( MSH )
1
63 km
1
4
Unjha
( UJA )
1
83 km
5
Siddhpur
( SID )
1
98 km
6
Palanpur Jn
( PNU )
1
128 km
2
7
Abu Road
( ABR )
1
181 km
2
8
Pindwara
( PDWA )
1
224 km
9
Jawai Bandh
( JWB )
1
263 km
10
Falna
( FA )
1
279 km
2
11
Marwar Jn
( MJ )
1
346 km
1
12
Pali Marwar
( PMY )
1
376 km
1
13
Jodhpur Jn
( JU )
1
449 km
1
14
Pipar Road Jn
( PPR )
1
496 km
1
15
Merta Road Jn
( MTD )
1
553 km
3
16
Nagaur
( NGO )
1
611 km
1
17
Nokha
( NOK )
1
662 km
1
18
Bikaner Jn
( BKN )
2
726 km
2
19
Lalgarh Jn
( LGH )
2
730 km
1
20
Lunkaransar
( LKS )
2
806 km
21
Suratgarh Jn
( SOG )
2
908 km
2
22
Pili Bangan
( PGK )
2
932 km
1
23
Hanumangarh Jn
( HMH )
2
958 km
1
24
Sangaria
( SGRA )
2
984 km
1
25
Mandi Dabwali
( MBY )
2
1014 km
1
26
Bhatinda Jn
( BTI )
2
1050 km
1
27
Goneana
( GNA )
2
1062 km
28
Gangsar Jaitu
( GJUT )
2
1076 km
1
29
Kot Kapura
( KKP )
2
1092 km
1
30
Faridkot
( FDK )
2
1105 km
31
Firozpur Cant
( FZR )
2
1137 km
4
32
Mallanwala Khas
( MWX )
2
1161 km
1
33
Makhu
( MXH )
2
1179 km
1
34
Lohian Khas Jn
( LNK )
2
1203 km
1
35
Sultanpur Lodi
( SQR )
2
1209 km
1
36
Kapurthala
( KXH )
2
1234 km
1
37
Jalandhar City
( JUC )
2
1255 km
3
38
Bhogpur Sirwal
( BPRS )
2
1283 km
1
39
Tanda Urmar
( TDO )
2
1296 km
1
40
Dasuya
( DZA )
2
1312 km
2
41
Mukerian
( MEX )
2
1327 km
2
42
Pathankot Cantt
( PTKC )
2
1367 km
2
43
Pathankot
( PTK )
2
1370 km
3
44
Kathua
( KTHU )
2
1394 km
1
45
Hira Nagar
( HRNR )
2
1423 km
1
46
Ghagwal
( GHGL )
2
1428 km
2
47
Vijaypur Jammu
( VJPJ )
2
1449 km
1
48
Jammu Tawi
( JAT )
Ends
-
2
1470 km
2
*Note: Average delay is average of delays calculated over previous 7 days. Platform no. is indicative only. Please re-check platform info at the station before boarding train.
Gandhinagar Capital to Vaishno Devi Katra GNC JAT EXP 19223 timing
GNC JAT EXP (19223) runs from Gandhinagar Capital to Vaishno Devi Katra. It departs from Gandhinagar Capital station (GNC) at and arrives at Jammu Tawi station (JAT) at on platform 2. GNC JAT EXP takes 24 hrs to cover the distance of 1470 km between Gandhinagar Capital and Vaishno Devi Katra. It is a non-superfast train. The average speed of this train is 61.25 kmph. It has classes Second AC (2A), Third AC (3A) and Sleeper (SL). This train runs daily. Final chart for GNC JAT EXP is prepared at Gandhinagar Capital usually 3-4 hours before train departure time.
About Vaishno Devi Katra
Vaishno Devi is located in the state of Jammu and Kashmir (Jammu region). Vaishno Devi temple is one of the most popular religious spot in India. More than 10 million pilgrims visit Vaishno Devi every year. The temple is located on a 2800 ft high Trikuta Mountain. To go to Vaishno Devi, you first go to Jammu (a major railway head in North India). From Jammu, travel by road to Katra - 50 km. Katra serves as the base camp for pilgrims who visit Vaishno Devi. At Katra, one has to register for the Yatra. Around Katra, there are many caves where Devis (Goddesses) and Devatas (Gods) of Hindu mythology prefer to stay. Also one can visit Shiv Khori Gufa - some 4 hours drive on dusty and rough road. The cave is more than 150 mts long and there is a Svayambhu Lingum, which constantly baths in a milky lime fluid dripping from the ceiling. The route from Jammu to Shiv Khori is full of beautiful and picturesque mountains, waterfalls and lakes. Nearest airport from Vaishno Devi is in Jammu, just 34 km away.