Vaishno Devi Katra to Gandhinagar Capital JAT GNC EXP 19224 train schedule cloud_download
Station
Arrival
Departure
Halt
Day
Distance
Platform
1
Jammu Tawi
( JAT )
Starts
-
1
0 km
2
2
Vijaypur Jammu
( VJPJ )
1
21 km
2
3
Ghagwal
( GHGL )
1
42 km
1
4
Hira Nagar
( HRNR )
1
48 km
2
5
Kathua
( KTHU )
1
77 km
2
6
Pathankot
( PTK )
1
100 km
3
7
Pathankot Cantt
( PTKC )
1
104 km
1
8
Mirthal
( MRTL )
1
124 km
1
9
Mukerian
( MEX )
1
143 km
1
10
Dasuya
( DZA )
1
159 km
1
11
Tanda Urmar
( TDO )
1
174 km
2
12
Bhogpur Sirwal
( BPRS )
1
187 km
2
13
Jalandhar City
( JUC )
1
216 km
2
14
Kapurthala
( KXH )
1
236 km
1
15
Sultanpur Lodi
( SQR )
1
261 km
1
16
Lohian Khas Jn
( LNK )
1
267 km
1
17
Makhu
( MXH )
1
292 km
1
18
Mallanwala Khas
( MWX )
1
309 km
1
19
Firozpur Cant
( FZR )
1
333 km
4
20
Faridkot
( FDK )
1
365 km
1
21
Kot Kapura
( KKP )
1
378 km
1
22
Gangsar Jaitu
( GJUT )
1
394 km
2
23
Goneana
( GNA )
1
409 km
24
Bhatinda Jn
( BTI )
1
421 km
4
25
Mandi Dabwali
( MBY )
1
456 km
1
26
Sangaria
( SGRA )
1
486 km
1
27
Hanumangarh Jn
( HMH )
1
513 km
1
28
Pili Bangan
( PGK )
1
538 km
1
29
Suratgarh Jn
( SOG )
1
563 km
1
30
Lunkaransar
( LKS )
1
665 km
31
Lalgarh Jn
( LGH )
1
741 km
1
32
Bikaner Jn
( BKN )
2
744 km
2
33
Nokha
( NOK )
2
809 km
1
34
Nagaur
( NGO )
2
860 km
2
35
Merta Road Jn
( MTD )
2
917 km
1
36
Pipar Road Jn
( PPR )
2
974 km
1
37
Raika Bagh
( RKB )
2
1019 km
2
38
Jodhpur Jn
( JU )
2
1021 km
3
39
Pali Marwar
( PMY )
2
1095 km
1
40
Marwar Jn
( MJ )
2
1125 km
1
41
Falna
( FA )
2
1191 km
1
42
Jawai Bandh
( JWB )
2
1207 km
43
Pindwara
( PDWA )
2
1246 km
44
Abu Road
( ABR )
2
1290 km
1
45
Palanpur Jn
( PNU )
2
1343 km
1
46
Siddhpur
( SID )
2
1372 km
1
47
Unjha
( UJA )
2
1387 km
1
48
Mahesana Jn
( MSH )
2
1408 km
1
49
Kalol Jn
( KLL )
2
1449 km
50
Gandhinagar Capital
( GNC )
Ends
-
2
1470 km
*Note: Average delay is average of delays calculated over previous 7 days. Platform no. is indicative only. Please re-check platform info at the station before boarding train.
Vaishno Devi Katra to Gandhinagar Capital JAT GNC EXP 19224 timing
JAT GNC EXP (19224) runs from Vaishno Devi Katra to Gandhinagar Capital. It departs from Jammu Tawi station (JAT) at from platform 2 and arrives at Gandhinagar Capital station (GNC) at . JAT GNC EXP takes 24 hrs to cover the distance of 1470 km between Vaishno Devi Katra and Gandhinagar Capital. It is a non-superfast train. The average speed of this train is 61.25 kmph. It has classes Second AC (2A), Third AC (3A) and Sleeper (SL). This train runs daily. Final chart for JAT GNC EXP is prepared at Vaishno Devi Katra usually 3-4 hours before train departure time.
About Vaishno Devi Katra
Vaishno Devi is located in the state of Jammu and Kashmir (Jammu region). Vaishno Devi temple is one of the most popular religious spot in India. More than 10 million pilgrims visit Vaishno Devi every year. The temple is located on a 2800 ft high Trikuta Mountain. To go to Vaishno Devi, you first go to Jammu (a major railway head in North India). From Jammu, travel by road to Katra - 50 km. Katra serves as the base camp for pilgrims who visit Vaishno Devi. At Katra, one has to register for the Yatra. Around Katra, there are many caves where Devis (Goddesses) and Devatas (Gods) of Hindu mythology prefer to stay. Also one can visit Shiv Khori Gufa - some 4 hours drive on dusty and rough road. The cave is more than 150 mts long and there is a Svayambhu Lingum, which constantly baths in a milky lime fluid dripping from the ceiling. The route from Jammu to Shiv Khori is full of beautiful and picturesque mountains, waterfalls and lakes. Nearest airport from Vaishno Devi is in Jammu, just 34 km away.